9D: Battery Disposal and Recycling
Instructions: Watch the video and complete the quiz. [ld_video]
Lab 10.2: Making Wet Cell Intercell Connections
Instructions: No video here and no assignment upload. Use the Handout available in the “Materials” tab. It is very detailed and walks you through the requirements to install the intercell connectors on the 3CC-3M wet cell training battery to create a single 6V battery. Complete the tasks, and click mark complete. (Proof of work will […]
Lab 11.3: PPE Selection for Battery Energy Storage Systems
Instructions: This is your last lab activity! By now you know the drill. It’s related to SW3 in Building 7R. If you’re totally lost, you saw this switch in the video for Lab 9.1. Upload your work order/energized permit to complete activity.
Lab 11.2: Method of procedure for multi-array battery installation
Instructions: Access assignment and supporting materials from the “Materials” tab above. Develop an MOP, in any format you would like, that describes the steps needed to complete the work in the Handout document. Upload your MOP to complete the Lab.
Lab 11.1: Making Intertier and Intercomponent Cables (Jumpers)
Instructions: Access the handout and discussion document in the “Materials” tab above. This is just like Lab 10.1, but this time you are making different conductors with potentially different requirements. You will be making the inter-row cable, and the cables that go to the disconnect. Each has different requirements. Be ready to show and discuss […]
Lab 10.3: Connecting Batteries (Cells), Checking Polarities and Voltages
Instructions: Access assignment and supporting materials from the “Materials” tab above. No video here as the handout and discussion documents are self-explanatory. Perform the work, and mark complete. Once again, proof of work will be required in recitation.
Lab 10.1: Making Inter-Cell and Inter-Battery Cables (Jumpers)
Instructions: Watch the video and complete the lab activities. No upload required. Access assignment and supporting materials from the “Materials” tab above.
Lab 9.2: PPE selection for battery energy storage systems – PV voltage
Instructions: No video necessary here. Access assignment and supporting materials from the “Materials” tab above. This is just like Lab 9.1, but the task (‘Description of work’) in the work order has changed. This is once again referencing the Building 7R drawings. Careful here, they are looking for PV voltage. You’ll have to find that […]
Lab 9.1: PPE selection for battery energy storage systems – String jumpers
Instructions: Watch the video and complete the lab activities. Complete and upload the assignment. Access assignment and supporting materials from the “Materials” tab above.
Lab 6.2: PPE selection for battery energy storage systems – Contactor replacement
Instructions: Watch the video and complete the lab activities. Complete and upload the assignment. Access assignment and supporting materials from the “Materials” tab above.